client | DFCM utah | SUU Football Operations || site area | 0.7 acres || built up | 14,000 sq.ft || floors | three || building completion | 2027
client | DFCM utah | SUU Football Operations || site area | 0.7 acres || built up | 14,000 sq.ft || floors | three || building completion | 2027
f o o t b a l l o p e r a t i o n b u i l d i n g | u t a h
credit : method studio
Located in Cedar City, the SUU West Campus Football Operations Building is a new three-story facility that significantly upgrades the university's athletic district. The building features a 132-locker hub, flexible meeting spaces, and coaching suites, developed alongside a broader campus upgrade including a new concessions ticketing, and flood mitigation.
Directed project development from concept through permitting, managing the internal architectural team to produce comprehensive construction document packages and independently prepared the complete project manual.